Intergration of a clinker transport into PCS7 Minerals

For a southern German cement plant, KMI integrated an existing clinker transport based on Wonderware into the new PCS7 V9 with the minerals standard.

The software of the controlers was adapted according to the plant standards and was installed in the factory and put into operation  during the anual maintanance period.