Upgrade of two control systems in a south German cement plant
For a southern German cement plant, KMI updated the two PCS7 control systems from CEMAT version 8 to the latest version PCS7 V9 with the minerals standard.
The software of all 18 controlers was adapted within 8 months and was installed and put into operation in the factory during the annual winter maintainance.